How Whitehorse is built
- Before 1961 8%
- 1961–1990 41%
- 1991–2000 16%
- 2001 or later 35%
Reporting rules that apply in Whitehorse
- No city-specific rule found (none found): No municipal energy/water benchmarking, reporting or building-performance by-law found; provincial rules apply (see rules.provinces.YT).
Incentives for audits and studies
- Rebates for energy upgrades to commercial and institutional buildings (Government of Yukon): Rebates for energy upgrades (small projects: heat pumps, ENERGY STAR appliances/windows, biomass, HRVs, insulation/air sealing, solar hot water). Large projects need an energy model by an engineer or certified technician showing at least 20% carbon reduction; funding up to 25% for for-profits (40% for biomass/heat pumps in existing buildings), 50% for non-profits, 60% for First Nations, municipalities and Crown corporations. No standalone rebate for audits or energy models was found. Details
Audit levels
- Level 1, walk-through: a site visit and bill review that benchmarks the building and lists low-cost measures.
- Level 2, energy survey and analysis: where the energy goes, with savings and cost estimates per measure. Most incentive applications use this level.
- Level 3, detailed analysis: monitoring and modelling for capital-intensive projects.
Ask which level a quote covers. Audits are done by engineering firms and energy consultants; look for a P.Eng. and credentials such as the Certified Energy Manager (CEM). How commercial energy audits work.
Commercial energy audit in Whitehorse: common questions
Do Whitehorse buildings have to report energy use?
We found no mandatory reporting rule for Whitehorse buildings as of September 28, 2026.
Are there incentives for commercial energy audits in Whitehorse?
Yes: Rebates for energy upgrades to commercial and institutional buildings. Check eligibility and pre-approval rules before you commission the audit.
What does a commercial energy audit cost?
It depends on the building's size and the ASHRAE level. Get quotes that state the level and the deliverables.